About POLARR AZANJE
RESUME' of ENGR. ROMULO E. POLICARPIO
OBJECTIVE :
To become a member of a team involve in preparing civil and structural engineering design and plans in the capacity of a civil engineering drafting technician or an office engineering technician.
SUMMARY OF QUALIFICATION :
Twenty Seven years of intense civil, structural, mechanical, architectural and drafting experience.
EDUCATION:
HOLY ANGEL UNIVERSITY, Angeles City, Philippines 1977 - 1982
Bachelor of Science in Civil Engineering
DON HONORIO VENTURA ARTS & TRADE, Pamp. Phil. 1975 - 1977
Course in Technical Drafting
DRAFTING & ENGINEERING EXPERIENCE:
POLARR AZANJE CONSTRUCTION August 2003 - Present
President / General Manager
PROJECT ENGINEER and QUALITY CONTROL
HANJIN CONSTRUCTION CO. Tamuning Guam, USA
GUAM INTERNATIONAL AIRPORT PROJECT June 1998 - July 2001
- Prepare sub-contractor’s scope of works
- Ensure that all phases of works are in the proper sequence, according to the recognized standards in compliance with the contract requirements.
- Prepare weekly progress status and monthly accomplishments reports.
- Ensure that all phases of works will be finished in timely manner.
- Investigate differing site conditions and make appropriate recommendation.
FIELD ENGINEER
PACIFIC DRILLING INC., Harmon Guam, USA August 1996 - May 1998
- Supervised lay-out of underground pipelines construction and installation of water and sewer station.
- Supervised a group of workers in miscellaneous civil works activities, water line, sewer line and drainage utilities installation.
- Inspection and quality assurance of the sub-contractor’s work.
- Prepare a work schedule, manpower and requirements if required.
- Identify equipment and materials requiring long delivery times.
- Supervisory duties: provide administrative and technical supervision over sub- contractors.
- Review daily construction reports by the sub-contractors to assure their proper completion of the report.
- Conduct weekly “Tool Box” meeting with the workers in order to prevent hazards or imminent danger all applicable safety rules, relations and policies
FIELD ENGINEER
ACME ENGINEERING INC., Los Angeles Ca., USA
SOUTHERN CALIFORNIA EDISON ELECTRIC March 1992 - June 1996
CO. PROJECT
- Prepare and schedule change and make appropriate action for the speedy performance and maintain records of changes and the corresponding cost to be supported with shop drawing.
- Implement strictly all quality control standards and specifications.
- Prepare Rebar bending, schedule of all rebar requirements.
- Supervised and fabrication, delivery and installation of all rebar work.
- Expedite materials required for the projects.
- Enforces all applicable safety rules, regulations and policies.
RESIDENT ENGINEER
APR CONSTRUCTION INC., Los Angeles Ca., USA
DIAMOND BAR SHOPPING MALL PROJECT August 1991 - Feb. 1992
- Provide administrative and technical supervision on construction’s contract, ensuring that the owner is receiving good quality of work and materials.
- Corresponding preparations: review contractor’s APR Const. Inc. Correspondence and prepare ( i.e. letter, memorandum message etc.)
- Review and approve or disapprove contractor’s submittal (i.e. Shop drawings, brochures, construction schedules, payments request, estimates for changes or order etc.
- Proper accomplishment and progress reports.
- Evaluation of progress performance of the contractors and ensure that all workers and materials finished complies with the plans specification.
RESIDENT ENGINEER
JACINTO COLORSTEEL. INC., Manila, Philippines
ROOFING MATERIAL PROJECT March 1989 - June 1991
- Prepare materials take-off and cost estimate for prospective of the project.
- Coordinate with the owner / representative of the project.
- Provide technical assistance to general force with respective project and prepare programs of works as per plans and specification.
- Supervise, prepare and schedule all activities to ensure that the project will be finished in time.
CIVIL ENGINEER
LUCKY DEVELOPMENT CO. LTD., Riyadh, Saudi Arabia
IMAM UNIVERSITY PROJECT April 1984 - Dec. 1988
- Supervisor duties: provide Administrative and technical supervision over six to eleven sub-contractors.
- Provide technical assistance to sub-contractors.
- Investigate differing site conditions and make appropriate recommendations.
- Prepare progress status reports.
- Supervisions and evaluation of project performance of sub-contractors and to ensure that all works and materials furnished complies with plans and specification.
- Performed site checking on actual quantity of installed approved materials.
- Attend and provide technical consultancy on negotiation for change order of assigned projects.
CIVIL ENGINEER
MINISTRY OF PUBLIC WORKS AND HIGHWAYS., Reg.III Philippines
Dec. 1982 - Feb. 1984
- Conduct laboratory and fields testing on soil densities, flexural and compressive strength test, core test, slump test CMU test, etc.
- Technical construction problem investigation: Investigate site condition and make appropriate recommendations. Investigate, analyze and initiate action on with appropriate preparation of drawings. Sketches or other design to illustrate recommendation solutions.
CIVIL ENGINEER AIDE
MINISTRY OF PUBLIC WORKS AND HIGHWAYS., Region, Philippines
May 1981 - Nov. 1982
- Checked project for adherence to plans and specifications inspected the quality and quantity of construction materials delivered to project, recorded and reported the type and working condition of equipment used. Prepared sample from report of accomplishments and program of works. Performed engineering computations.
- Received the work to be estimated the amount of construction materials needed.
- Interpreted plans and prepare bill of materials.
- Was also engaged in inspecting structures needed for improvements, repair and maintenance.
CIVIL ENGINEER DRAFTSMAN
MINISTRY OF PUBLIC WORKS AND HIGHWAYS., Region, Philippines
January 1978 - April 1981
- Draft general elevations, plans and superstructure of buildings and bridges, plotted the design data gathered from field survey prior to final drafting, made necessary corrections of plans and submitted to regional office by different district / City engineering offices for endorsement to the ministry main office.

/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////